Link to Decision Summarized Download Summary in PDF Solar – Facilities Application Dolcy Solar Inc. (“Dolcy”) applied to construct and operate the Dolcy Solar + Energy Storage Project (“Project”), which consisted of a 300-megawatt (“MW”) solar power plant, the Dolcy...
Search Results
These articles by our expert team cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commision (AUC), and Canada Energy Regulator (CER). Browse our searchable archive below to learn more about the results we’ve achieved for our clients.
WR2 Wind GP Corp. and Wild Rose 2 Wind Inc. Wild Rose 2 Wind Power Project Amendment, AUC Decision 27729-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities – Environmental Application WR2 Wind GP Corp. and Wild Rose 2 Wind Inc. (collectively, “WR2”) filed an application with the Alberta Utilities Commission (“AUC”) for approval to amend the Wild Rose 2 Wind...
Qualico Developments West, Reconsideration of the April 20, 2022, Decision, AER Decision 2024 ABAER 007
Link to Decision Summarized Download Summary in PDF Facilities – Environmental Application Qualico Developments West Ltd. (“Qualico”) filed an application, as amended (“Application”), with the Alberta Energy Regulator (“AER”) requesting pursuant to s 33 of the...
ENMAX Power Corporation Recovery of Land and Property Rights Tribunal Order Payments Related to Remington Lands Matter, AUC Decision 28911-D01-2024
Link to Decision Summarized Download Summary in PDF Rates – Knowledge Exception Application ENMAX Power Corporation (“EPC”) applied to recover, in its 2025 revenue requirement, the amount of $13.63 million related to EPC’s obligations to pay Remington Development...
AUC Consultation on Rule 007 and Enhanced Interim Information Requirements, Bulletin 2024-08
Link to Bulletin Summarized Download Summary in PDF Electricity Generation Inquiry – Facility Applications AUC Consultation on Rule 007 All new power plant and energy storage facility applications filed on or after May 2, 2024, must satisfy the existing Rule 007:...
TransAlta Corporation v Alberta (Environment and Parks), 2024 ABCA 127
Link to Decision Summarized Download Summary in PDF Statutory Appeal – Confidentiality Application The Minister of Environment and Parks ("AEP" or "Crown") appealed a decision of the case management judge ordering the production of eight records ("Disputed...
2024/25 Orphan Fund Levy/LLR and OWL Programs, AER Bulletin 2024-08
Link to Bulletin Summarized Download Summary in PDF Oil and Gas – Abandonment The Government of Alberta approved a levy of $135 million to fund the Orphan Well Association’s (“OWA”) operating budget for the fiscal year 2024/25. As a result, the AER prescribed an...
AUC Updates to Rule 007, AUC Bulletin 2024-06
Link to Bulletin Summarized Download Summary in PDF Facilities – Applications The AUC updated Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations, Hydro Developments and Gas Utility Pipelines (“Rule 007”) to align...
Airport City East Ltd. Airport City Solar Project, AUC Decision 27885-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities – Duty to Consult Application Airport City Solar East Ltd. (“ACSE”) requested approval to construct and operate the 112-megawatt (“MW”) Airport City Solar power plant (the “Project”) bordering the Edmonton...
Peace River Energy Project Inc. Peace River Energy Project and Interconnection, AUC Decision 28616-D01-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application Peace River Energy Project Inc. (“PREP”) applied for approval to construct and operate the 4.99-megawatt (“MW”) Peace River Energy Project solar power plant (the “Project”), located...
Aura Power Renewables Ltd. Peace Butte Solar Farm and Battery Storage Project, AUC Decision 28259-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities - Solar Application Aura Power Renewable Ltd. (“Aura Power”) applied for approval to construct and operate the 230-megawatt (“MW”) Peace Butte Solar Farm and Battery Storage Project (the “Project”),...
ATCO Electric Ltd. 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28570-D02-2024
Link to Decision Summarized Download Summary in PDF Facilities - Solar Application ATCO Electric Ltd. (“AE”) submitted its 2024 annual performance-based regulation (“PBR”) rate adjustment filing pursuant to the provisions of the third generation PBR (“PBR3”) plan. AE...
FortisAlberta Inc. Application for Direction to Pay Compensation Related to Site Transfers, AUC Decision 28358-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities - Value Application FortisAlberta Inc. (“Fortis”) requested the AUC to direct the transfer of electric distribution system assets from Battle River Power Coop REA Ltd. (“BRPC”) to Fortis, including the...
Inuvialuit Energy Security Project Ltd – Application for Authorization for Installation and Operation of the Energy Centre, File OF-EP-OA-I184-1414 03/4257714, C28698-1
Link to Decision Summarized Download Summary in PDF Gas - Facilities Application Inuvialuit Energy Security Project Ltd. (“IESPL”) applied to the Canadian Energy Regulator (“CER”) for approval of the installation and operation of the Inuvialuit Energy Security Project...
Site Reduction Reclamation Certificate Pilot, AER Bulletin 2024-05
Link to Bulletin Summarized Download Summary in PDF Facilities – Partial Reclamation In December 2023, Alberta Environment and Protected Areas (“AEPA”) announced the Interim directive: pilot for site reductions on well sites (Land Policy, 2023, No.2), regarding a...
Pilot for Reclaiming Peatlands, AER Bulletin 2024-04
Link to Bulletin Summarized Download Summary in PDF Oil and Gas – Land Reclamation On December 14, 2023, Alberta Environment and Protected Areas (“AEPA”) released the Interim directive: pilot for reclaiming peatlands - decision framework and support tools for...
Inuvialuit Energy Security Project Ltd. Application for a Well Approval in Relation to the TUK M-18 Well Pursuant to Subsection 10(1) of the Northwest Territories’ Oil and Gas Drilling and Productions Regulations, CER Letter Decision A8W4J5 (C28481-1)
Link to Decision Summarized Oil and Gas - Facilities Application ATCO Pipelines (“AP”) requested approval of the 2024 revenue requirement of $362,852,000 on an interim and refundable basis. Decision The AUC approved AP’s 2024 interim revenue requirement of...
ATCO Electric Ltd. Kiwetinohk Opal Transmission Project, AUC Decision 28658-D01-2024
Link to Decision Summarized Electricity – Facilities Application ATCO Electric Ltd. (“AE”) applied for approval to construct and operate a new transmission line, a transmission line alteration and a connection to the approved Kiwetinohk Opal Gas Project. Decision The...
Directive 026 Rescinded, AER Bulletin 2024-02
Link to Decision Summarized Oil – Facilities To eliminate duplicative or obsolete requirements, the AER rescinded Directive 026: Setback Requirements for Oil Effluent Pipelines (“Directive 026”), effective immediately. The AER also rescinded the Directive 026 related...
New Edition of Directive 023, AER Bulletin 2024-01
Link to Decision Summarized Oil - Facilities On February 8, 2024, the Alberta Energy Regulator (“AER”) released a new edition of Directive 023: Oil Sands Project Applications (“Directive 023”), effective immediately. Directive 023 replaced the May 2013 draft edition....
Enforcement Staff of the Alberta Utilities Commission Settlement Agreement with Avex Energy Inc., AUC Decision 28765-D01-2024
Link to Decision Summarized Enforcement - Facilities Application Enforcement staff of the AUC Enforcement Division (“Enforcement Staff”) applied for approval of a negotiated settlement agreement (“NSA”) between Enforcement Staff and Avex Energy Inc. (“Avex”) in...
TransAlta Corporation Pinnacle 1 & 2 Peaking Thermal Electric Power Project, AUC Decision 28464-D01-2024
Link to Decision Summarized Thermal Peaking - Facilities Application TransAlta Corporation (“TransAlta”) applied for approval to construct and operate a natural gas-fired thermal power plant (the “Power Plant”), including an associated substation, located within the...
Trans Mountain Pipeline ULC Trans Mountain Expansion Project Certificate of Public Convenience and Necessity OC-065 Application for Variance and Condition Relief under the Certificate Mountain 3 Horizontal Directional Drill, CER Reasons for Decision (C28265-3; A8W1D0)
Link to Decision Summarized Gas - Facilities Application Trans Mountain Pipeline ULC (“Trans Mountain”), pursuant to s 190 of the Canadian Energy Regulator Act , submitted an application to vary (“Application”) Schedule A of Certificate of Public Convenience and...
PGI Processing ULC Power Plant Application for Kybob #3 South Gas Plant, AUC Decision 28337-D01-2024
Link to Decision Summarized Gas – Facilities Application PGI Processing ULC (“PGI”) applied for approval to construct and operate a new 33-megawatt cogeneration power plant within the fenceline of the existing Kaybob #3 South Gas Plant (the “K3 Plant”) near Fox Creek,...
ATCO Gas and Pipelines Ltd Cloverbar Hydrogen Lateral Transmission Pipeline Project, AUC Decision 28555-D01-2024
Link to Decision Summarized Gas - Facilities Application ATCO Gas and Pipelines Ltd (“ATCO”) applied for approval to construct and operate 1.4 kilometers of new 219.1-millimeter high-pressure natural gas pipeline and related above-ground facilities (the “Project”)...
2171802 Alberta Ltd. Bull Pound Solar Project Termination of Community Generation Designation, AUC Decision 28703-D01-2024
Link to Decision Summarized Solar Power – Generation Program Cancellation Application 2171802 Alberta Ltd., operating as Bull Pound Solar Partners (“BPSP”), requested that the AUC rescind the community generating unit designation for the 15-megawatt (“MW”) Bull Pound...
ATCO Electric Ltd. Approval of Sale Offering for Narrows Point Power Plant, AUC Decision 28699-D01-2024
Link to Decision Summarized Electricity - Facilities Application ATCO Electric Ltd. (“AE”) applied for approval of a sale offering for isolated generating units CUL 483, CUL 429, CUL 430 and CUL 280 (“Isolated Units”) contained within its Narrows Point Power Plant...
Trans Mountain Pipeline ULC Trans Mountain Expansion Project Application Pursuant to Subsection 69(1) of the Canadian Energy Regulator Act Mountain 3 Horizontal Directional Drill Variance Application, CER Reasons for Decision
Link to Decision Summarized Oil and Gas - Facilities Application Trans Mountain Pipeline ULC (“Trans Mountain”) filed an application requesting a variance of Certificate of Public Convenience and Necessity OC-065 (the “Certificate”). The variance involved a change to...
New Edition of Manual 023, AER Bulletin 2023-44
Link to Decision Summarized Oil and Gas - Facilities The AER released a new edition of Manual 023 Licensee Life-Cycle Management that includes clarifications based on feedback received as part of the ongoing implementation of the Government of Alberta’s Liability...
Enforcement Staff of the AUC Allegations Against Energy Sustain Service Ltd. and Zong Tang, Phase 1, AUC Decision 28170-D01-2023
Link to Decision Summarized Facilities - Approval Requirement Application Enforcement staff of the AUC (“Enforcement Staff”), following an investigation prompted by a noise complaint, filed an application with the AUC alleging that Energy Sustain Service Ltd. (“ESS”)...
Apex Utilities Inc. Drumheller High Pressure Pipeline Project, AUC Decision 28498-D01-2023
Link to Decision Summarized Gas - Facilities Application Apex Utilities Inc. (“AUI”) applied for approval to install the Drumheller High Pressure Pipeline Project, consisting of approximately 1,040 meters (“m”) of new 114.3-millimeter (“mm”) natural gas pipeline as...
ATCO Electric Ltd. Brintnell Area Fibre Optic Project, AUC Decision 28472-D01-2023
Link to Decision Summarized Electricity - Communication Application ATCO Electric Ltd. (“AE”) applied for approval to construct and operate a 13-kilometer (km”) overhead fibre optic cable between AE’s existing Brintnell 876S Substation and Alberta PowerLine General...
AECG Forty Mile Wind GP Corp. Forty Mile Wind Power Project Amendments, AUC Decision 27561-D05-2023
Link to Decision Summarized Wind Power - Safety Application RES Forty Mile Wind GP Corp (“RES”) applied to amend, construct and operate the previously approved Forty Mile Wind Power Project (the “Project”) and the Forty Mile 516S Substation. RES also applied to split...
ATCO Electric Ltd. Application for Orders Relating to the City of Lloydminster Annexation, Decision 28016-D01-2023
Link to Decision Summarized Electricity - Service Area Application ATCO Electric Ltd. (“AE”) applied to the Alberta Utilities Commission (“AUC”) for: confirmation of exclusive service area boundaries as determined by applicable Electric Distribution System Municipal...
Solar Krafte Utilities Inc. and Beargrass Solar Inc. Brooks Solar Farm Project Amendment, Time Extension and Approval and Permit and Licence Transfer, AUC Decision 27916-D01-2023
Link to Decision Summarized Solar Power - Facilities Application Solar Krafte Utilities Inc. (“Solar Krafte”) applied for approval to amend, construct and operate the 360-megawwatt (“MW”) Brooks Solar Farm power plant (the “Project”). Solar Krafte also applied for...
ATCO Gas and Pipelines Ltd. Swanhills Loop Transmission Project, AUC Decision 28431-D01-2023
Link to Decision Summarized Gas - Facilities Application ATCO Gas and Pipelines Ltd. (“AG”) applied for approval to construct and operate the Swanhills Loop Transmission Project, consisting of 4.6 kilometers (“km”) of new 168.3-millimeter (“mm”) high-pressure natural...
Trans Mountain Pipeline ULC TMEP Application Pursuant to Section 211 of the Canadian Energy Regulator Act Segment 5.3 – Pípsell (Jacko Lake), CER Reasons for Decision A8T7K1
Link to Decision Summarized Gas - Facilities Application Trans Mountain Pipeline ULC (“Trans Mountain”) applied for approval of a deviation (“Deviation Application”) to the approved plan, profile and book of reference (“PPBoR”) in respect of certain lands in Segment...
NorthRiver Midstream NEBC Connector GP Inc., CER Report OH-001-2022
Link to Decision Summarized Natural Gas Liquids - Facilities Application NorthRiver Midstream NEBC Connector GP Inc. (“NorthRiver”), a wholly owned subsidiary of NorthRiver Midstream Inc., applied for authorization to construct and operate the NEBC Connector Project...
ATCO Electric Ltd. Dog Rib Fibre Optic Connection Project, AUC Decision 28463-D01-2023
Link to Decision Summarized Communications - Facilities Application ATCO Electric Ltd. (“AE”) applied for approval to construct and operate the 185-meter (“m”) ELADFO021 underground fibre optic telecommunications cable, from AE’s existing Dog Rib 2082S Substation to...
Reclamation Liability Reduction Program Being Developed, AER Bulletin 2023-37
Link to Decision Summarized Oil and Gas – Facilities The AER is implementing a reclamation liability reduction program (the “Program”), with an anticipated release in the spring of 2024. The Program is intended to allow licensees to request a temporary reduction of...
Alberta Electric System Operator Needs Identification Document Application, AltaLink Management Facility Applications – Georgetown Solar Project Connection, AUC Decision 28327-D01-2023
Link to Decision Summarized Solar Power – Facilities Application Georgetown Solar Inc. (“Georgetown Solar”) has an AUC approval to construct the Georgetown Solar + Energy Storage Project (the “Power Plant”), which includes a solar power plant, a battery energy storage...
AltaLink Management Ltd. Vauxhall Solar Farm Connection, AUC Decision 28440-D01-2023
Link to Decision Summarized Communication - Facilities Application AltaLink Management Ltd. (“AML”) applied for approval to connect Solar Krafte Utilities Inc.’s (“Solar Krafte”) Vauxhall Solar Farm to the Alberta Interconnected Electric System (“AIES”) through a new...
ATCO Electric Ltd. Sweeney Creek Telecommunications Tower Site Project, AUC Decision 28360-D01-2023
Link to Decision Summarized Communications – Facilities Application ATCO Electric Ltd. (“AE”) applied to the AUC for approval to construct and operate the new Sweeney Creek 1090 Telecommunications Tower Site (the “Project”), located on Crown land, approximately 50...
ATCO Electric Ltd. Touchwood Telecommunications Tower Connection Project, AUC Decision 28442-D01-2023
Link to Decision Summarized Communications - Facilities Application ATCO Electric Ltd (“AE”) applied to decommission and salvage the Touchwood Microwave Power Plant and alter the Touchwood Telecommunications Tower Site by connecting it to the Alberta Interconnected...
Validating Facility Operational Life-Cycle Statuses, AER Bulletin 2023-34
Link to Decision Summarized Oil and Gas - Facilities The AER announced that it would contact applicable licensees by email to validate the operational life-cycle status of their facilities, as an one-time supplemental data request. Additional information is required...
Alberta Electric System Operator Needs Identification Document Application and Section 15(2) Application AltaLink Management Ltd. Facility Applications Vauxhall Area Transmission Development, AUC Decision 27776-D01-2023
Link to Decision Summarized Electricity - Facilities Application The Alberta Electric System Operator (“AESO”) filed a needs identification document (“NID”) application, for approval of the need for the Vauxhall Area Transmission Development (the “NID Application”)....
Enterprise Solar GP Inc. Enterprise Solar Project Amendments, AUC Decision 28315-D01-2023
Link to Decision Summarized Electricity - Facilities Application Enterprise Solar GP Inc., on behalf of Enterprise Solar LP (“Enterprise Solar”), filed a letter of inquiry with the AUC for amendments to the approved but not yet constructed Enterprise Solar power plant...
ATCO Electric Ltd. Loyalist Fibre Optic Connection Project, AUC Decision 28408-D01-2023
Link to Decision Summarized Communication - Facilities Application ATCO Electric Ltd. (“AE”) applied for permission to construct and operate 640 meters of underground fibre optic cable from AE’s existing Loyalist 903S Substation to its existing optical protection...
IPC Canada Ltd. Blackrod Cogeneration Power Plant, AUC Decision 28187-D01-2023
Link to Decision Summarized Electricity - Facilities Application IPC Canada Ltd. (“IPC”) applied to construct and operate a 33.06-megawatt (“MW”) natural gas-fired cogeneration power plant and a 2.5-MW dual fuel diesel/natural gas-fired emergency backup power plant...
Interim Rule 007 Information Requirements, AUC Bulletin 2023-05
Link to Decision Summarized Electricity - Facilities On September 6, the AUC announced the introduction of new and interim information requirements relating to agricultural land, municipal land use, viewscapes, reclamation security, and land use planning as part of...