These articles by our expert team cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commision (AUC), and Canada Energy Regulator (CER). Browse our searchable archive below to learn more about the results we’ve achieved for our clients.

Dolcy Solar + Energy Storage Project, Decision 28723-D01-2024

Dolcy Solar + Energy Storage Project, Decision 28723-D01-2024

Link to Decision Summarized Download Summary in PDF Solar – Facilities Application Dolcy Solar Inc. (“Dolcy”) applied to construct and operate the Dolcy Solar + Energy Storage Project (“Project”), which consisted of a 300-megawatt (“MW”) solar power plant, the Dolcy...

Acestes Power ULC Tilley Solar Project, AUC Decision 27319-D01-2022

Link to Decision SummarizedSolar Power - FacilitiesApplicationAcestes Power ULC (“Acestes”) applied to construct and operate the 23.6-megawatt Tilley Solar Project (the “Project”) and to connect the Project to FortisAlberta Inc.’s 25-kilovolt electric distribution...