Regulatory Law Chambers logo

NU-E Corp. Lethbridge 1 Solar Project Checklist Application, AUC Decision 27721-D01-2022

Link to Decision Summarized

Solar Power – Facilities

Application

NU-E Corp (“NU-E”) filed a checklist application with the AUC to construct and operate the 8.75-megawatt (“MW”) Lethbridge 1 Solar Project (the “Power Plant”) on 40 acres of private, cultivated land in the city of Lethbridge. NU-E applied to connect the Power Plant to the City of Lethbridge Electric Utility’s distribution system.

Decision

The AUC approved the applications to construct, operate and connect the Power Plant.

Relevant Legislation

Alberta Utilities Commission Act, SA 2007, c A-37.2 – s 17.

Hydro and Electric Energy Act, RSA 2000, c H-16 – s 11.

AUC Rule 012: Noise Control.

AUC Rule 033: Post-approval Monitoring Requirements for Wind and Solar Power Plants.

Related Posts

New Edition of Directive 065, AER Bulletin 2023-12

New Edition of Directive 065, AER Bulletin 2023-12

Link to Bulletin Summarized Oil and Gas - Applications The AER released a new edition of Directive 065: Resources Applications for Oil and Gas Reservoirs (“Directive 065”). The new edition includes...