Link to Decision Summarized Download Summary in PDF Share Transfer – No-Harm Test Application Harmony Advanced Water Systems Corporation (“HAWSCO”) filed an application with the Alberta Utilities Commission (“AUC”) requesting the AUC to authorize pursuant to s 102(1)...
Search Results
These articles by our expert team cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commision (AUC), and Canada Energy Regulator (CER). Browse our searchable archive below to learn more about the results we’ve achieved for our clients.
TriSummit Utilities Inc. De-Designation Under Section 26 of the Gas Utilities Act, Decision 29096-D01-2024
Link to Decision Summarized Download Summary in PDF Markets – Financial Oversight Application TriSummit Utilities Inc. (“TSU”), a Canadian corporation designated as an owner of a gas utility and an owner of a public utility, filed an application with the Alberta...
AUC inquiry into the ongoing economic, orderly and efficient development of electricity generation in Alberta Module B Report, AUC Report in Proceeding 28542
Link to Decision Summarized Download Summary in PDF Markets – Renewables Inquiry On August 2, 2023, the Government of Alberta (“GOA”) issued an order-in-council (“Order”) directing the Alberta Utilities Commission (“AUC”) to hold an inquiry into the ongoing economic,...
Market Surveillance Administrator Application to Make Public a Record that Identifies a Market Participant by Name, AUC Decision 29038-D01-2024
Link to Decision Summarized Download Summary in PDF Offer Control – Calculation Method Application The Market Surveillance Administrator ("MSA") filed an application requesting the Alberta Utilities Commission ("AUC") to determine whether its decision to name a market...
Pivotal Energy Partners Inc. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Bantry Power Plant and Parkland Power Plant, AUC Decision 28894-D01-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application Pivotal Energy Partners Inc. (“Pivotal Energy”) applied under s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to...
AUC Inquiry Into the Ongoing Economic, Orderly and Efficient Development of Electricity Generation in Alberta – Module A Report, AUC Decision 28501-D01-2024
Link to Decision Summarized Download Summary in PDF Electricity – Markets Application On August 3, 2023, the Government of Alberta (“GoA”) issued an order-in-council (“Order”) directing the AUC to hold an inquiry into the ongoing economic, orderly and efficient...
London Economics International LLC Module B Study: Overview of Modeling Results and Key Findings Prepared for the Alberta Utilities Commission, AUC Proceeding 28542: AUC Inquiry Into the Ongoing Economic, Orderly and Efficient Development of Electricity Generation in Alberta
Link to Decision Summarized Market Development– Reliability Scope of Study The Government of Alberta directed the AUC to conduct an inquiry regarding the impact of the rising level of renewable energy on the Alberta electricity system, more specifically, the changes...
AUC Consultation on Proposed Rule Development for Emergency Billing Relief, AUC Bulletin 2024-01
Link to Decision Summarized Utility Billing - Rules The Alberta Utilities Commission (“AUC”) initiated a consultation process to incorporate requirements for emergency billing relief into a new rule to provide predictability and transparency for stakeholders. The AUC...
Northstone Power Corporation Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Elmworth Generation Station, AUC Decision 28781-D01-2024
Link to Decision Summarized Electricity - Markets Application Northstone Power Corporation (“Northstone”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”) seeking permission to share records not available to the public regarding...
ATCO Renewables Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Oldman River Hydro Power Plant, AUC Decision 28760-D01-2024
Link to Decision Summarized Hydro Power - Markets Application ATCO Renewables Ltd. (“ATCO Renewables”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”) seeking permission to share records not available to the public regarding...
AESO Application for Approval of Proposed Amendments to Section 306.4 of the ISO Rules, AUC Decision 28605-D01-2024
Link to Decision Summarized Electricity - ISO Rules Application The Alberta Electric System Operator (“AESO”) applied for approval of amendments to s 306.4, Transmission Planned Outage Reporting and Coordination of the Independent System Operator (“ISO”) Rules....
Direct Energy Marketing Limited Amendments to the Code of Conduct Regulation and Inter-Affiliate Code of Conduct Compliance Plan, AUC Decision 28623-D01-2024
Link to Decision Summarized Markets – Code of Conduct Compliance Application Direct Energy Marketing Limited (“DEML”) applied for approval of amendments to the Code of Conduct Regulation Compliance Plan of Direct Energy Regulated Services (“DERS”), Direct Energy...
Michichi Solar GP inc. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Michichi Solar Generation Facility, AUC Decision 28702-D01-2023
Link to Decision Summarized Solar Power - Markets Application Michichi Solar GP Inc. (“Michichi”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public. The information...
Kneehill Solar GP Inc. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Kneehill Solar Generation Facility, AUC Decision 28701-D01-2023
Link to Decision Summarized Solar Power - Markets Application Kneehill Solar GP Ltd. (“Kneehill”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public. The information...
Enforcement Staff of the Alberta Utilities Commission Settlement Agreement with the Consumers’ Coalition of Alberta, AUC Decision 28648-D01-2023
Link to Decision Summarized Markets - Rules Application AUC enforcement staff (“Enforcement Staff”) and the Consumers’ Coalition of Alberta (“CCA”) applied for approval of a settlement agreement (“Settlement”) related to a disclosure of confidential information by the...
Claresholm Solar GP Inc. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Claresholm Solar Power Plant, AUC Decision 28668-D01-2023
Link to Decision Summarized Solar - Markets Application Claresholm Solar GP Ltd. (“Claresholm Solar”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public. The...
Achernar GP Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Empress Solar Power Plant, AUC Decision 28667-D01-2023
Link to Decision Summarized Solar - Markets Application Achernar GP Ltd. (“Achernar”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public. The information was related...
Forty Mile Granlea Wind GP Inc. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Forty Mile Wind Power Project, Phase One, AUC Decision 28666-D01-2023
Link to Decision Summarized Wind Power - Markets Application Forty Mile Granlea Wind GP Inc. (“Forty Mile”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public...
Enfinite Corporation Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the eReserve 7, 8 and 9 Battery Energy Storage Power Plants, AUC Decision 28650-D01-2023
Link to Decision Summarized Wind Power - Markets Application Enfinite Corporation (“Enfinite”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public. The information...
General Land & Power Corp. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Sollair Solar Energy Power Plant, AUC Decision 28620-D01-2023
Link to Decision Summarized Solar Power - Markets Application General Land & Power Corp. (“GLP”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public regarding the...
BA2 Wind GP Corp. Application for an Order Permitting the Sharing of Records not Available to the Public Regarding the Buffalo Atlee Wind Farm 2, AUC Decision 28602-D01-2023
Link to Decision Summarized Electricity - Records Application BA2 Wind GP Corp. (“BA2 Wind”) applied to the AUC under s 3(3) of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public between BA2...
BA1 Wind GP Corp. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Buffalo Atlee Wind Farm 1, AUC Decision 28601-D01-2023
Link to Decision Summarized Electricity - Records Application BA1 Wind GP Corp., as general partner of BA1 Wind LP, (“BA1”) applied under the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public...
BA4 Wind Gp Corp. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Buffalo Atlee Wind Farm 4, AUC Decision 28594-D01-2023
Link to Decision Summarized Wind Power - Markets Application BA4 Wind GP Corp. (“BA4 Wind”), applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public regarding the Buffalo...
NuVista Energy Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Wembley Thermal Power Plant, AUC Decision 28571-D01-2023
Link to Decision Summarized Electricity - Markets Application NuVista Energy Ltd. (“NuVista”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public regarding the...
TransAlta Corporation, as Manager of the TransAlta Generation Partnership Application Concerning Arbitration Award for AltaLink Management Ltd. to Perform its Obligations Under the Operations and Maintenance Agreement, AUC Decision 28467-D01-2023
Link to Decision Summarized Electricity - Markets Application TransAlta Corporation (“TransAlta”) submitted to the AUC that the interim order issued in Decision 27168-D01-2023, regarding an operations and maintenance agreement (the “O&M Agreement”) reached between...
Enforcement Staff of the Alberta Utilities Commission Settlement Agreement with Persist Oil & Gas Inc., AUC Decision 28370-D01-2023
Link to Decision Summarized Market - Enforcement Application Enforcement staff of the AUC (“Enforcement Staff”) applied to the AUC for approval of a settlement agreement between Enforcement Staff and Persist Oil & Gas Inc. (“Persist”) related to a contravention...
Market Surveillance Administrator Application for Approval of a Settlement Agreement Between the Market Surveillance Administrator, EPCOR Energy Alberta GP Inc. and 1772387 Alberta Ltd, AUC Decision 28207-D01-2023
Link to Decision Summarized Gas – Markets Application The Market Surveillance Administrator (“MSA”) applied for approval of a settlement agreement between the MSA, EPCOR Energy Alberta GP Inc. as general partner of EPCOR Energy Alberta Limited Partnership...
2024-2028 Performance-Based Regulation Plan for Alberta Electric and Gas Distribution Utilities, AUC Decision 27388-D01-2023
Link to Decision Summarized Performance-Based Regulation Plan - Rates Application In Bulletin 2022-006, issued on May 26, 2022, the Alberta Utilities Commission (“AUC”) initiated Proceeding 27388 to establish the parameters of the performance-based regulation (“PBR”)...
Concord Vulcan GP2 Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Vulcan Solar Project, AUC Decision 28433-D01-2023
Link to Decision Summarized Solar - Markets Application Concord Vulcan GP2 Ltd. (“Vulcan GP2”) applied pursuant to s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public regarding the...
Market Surveillance Administrator Application for Approval of a Settlement Agreement Between the Market Surveillance Administrator, Canadian Hydro Developers Inc. and TransAlta Corporation, AUC Decision 28217-D01-2023
Link to Decision Summarized Electricity – Markets Application The Market Surveillance Administrator (“MSA”) applied for approval of a settlement agreement (the “Settlement”) between the MSA, Canadian Hydro Developers Inc. (“Canadian Hydro”), and TransAlta Corporation...
Concord Monarch GP2 Ltd. Application for an Order Permitting the Sharing of Records not Available to the Public Regarding the Monarch Solar Project, AUC Decision 28412-D01-2023
Link to Decision Summarized Electricity - Records Application Concord Monarch GP2 Ltd. (“Concord”) applied, under s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share non-public records related to the Monarch Solar Project...
Concord Coaldale GP2 Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Coaldale Solar Project, Decision 28413-D01-2023
Link to Decision Summarized Solar – Records Application Concord Coaldale GP2 Ltd. (“Coaldale GP2”) applied under s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public between Coaldale,...
2079816 Alberta Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Joffre Solar Project, AUC Decision 28399-D01-2023
Link to Decision Summarized Solar - Records Application 2079816 Alberta Ltd., as general partner of PACE LP (the “Applicant”), applied under s 3 of the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the...
AUC Inquiry Into the Ongoing Economic, Orderly and Efficient Development of Electricity Generation in Alberta, AUC Bulletin 2023-06
Link to Decision Summarized Electricity - Markets On August 3, 2023, the Alberta government issued Order in Council O.C. 171/2023, directing the AUC to inquire and report to the Minister of Affordability and Utilities on the following considerations: the development...
Enforcement Staff of the Alberta Utilities Commission, Phase 1 Enforcement Proceeding with Salt Box Coulee Water Supply Company Ltd., Decision 28021-D01-2023
Link to Decision Summarized Markets - Enforcement Application AUC enforcement staff (“Enforcement Staff”) filed an application with the AUC alleging that Salt Box Coulee Water Supply Company Ltd. (“Salt Box”), a public utility pursuant to the Public Utilities Act...
AltaLink Management Ltd. Application for 2023 Debt Issuance, AUC Decision 28322-D01-2023
Link to Decision Summarized Public Utilities Act – Debt Issuance Application AltaLink Management Ltd. (“AML”), in its capacity as general partner of AltaLink, L.P. (“ALP”), filed an application requesting approval to cause ALP to make one or more issues of senior...
TransAlta Corporation Application for Approval to Issue Shares, AUC Decision 28331-D01-2023
Link to Decision Summarized Markets - Reporting Application TransAlta Corporation (“TransAlta”) entered into an arrangement agreement (“Agreement”) with TransAlta Renewables Inc. (“TransAlta Renewables”), which provided for the acquisition of TransAlta Renewables by...
Balancing Pool Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Youngstown Solar Project, AUC Decision 28305-D01-2023
Link to Decision Summarized Electricity - Records Application The Balancing Pool, pursuant to 7 of the Small Scale Generation Regulation, acting on behalf of 2079816 Alberta as a small-scale power producer, filed an application under the Fair, Efficient and Open...
Enforcement Staff of the AUC Settlement Agreement with ENMAX Energy Corporation, AUC Decision 28201-D01-2023
Link to Decision Summarized Electricity - Markets Application AUC enforcement staff (“Enforcement Staff”) submitted an application for approval of a settlement agreement between Enforcement Staff and ENMAX Energy Corporation (“EEC”) (“Settlement Agreement”)....
Enforcement Staff of the AUC Settlement Agreement with ENMAX Energy Corporation, AUC Decision 28213-D01-2023
Link to Decision Summarized Markets - Enforcement Application The enforcement staff of the AUC (“Enforcement Staff”) applied for approval of a settlement agreement reached with ENMAX Energy Corporation (“EEC”) related to disclosure of confidential information by EEC...
File Changes for Brine Hosted Minerals, AER Bulletin 2023-28
Link to Bulletin Summarized Minerals – Resource Development The AER updated its Digital Data Submission system to enable the collection, in the pressure ASCII standard (PAS) file, of the data required to be submitted by licensees pursuant to requirement 79 of...
Inuvialuit Energy Security Project Ltd. Application to Amend a Development Plan for the Inuvialuit Energy Security Project Subject to Hearing Order MH-002-2022, CER Filing A8R2U7
Link to Decision Summarized Oil/Gas – Amendment Application Application On March 8, 2022, the CER approved the development plan for the proposed Inuvialuit Energy Security Project (the “IESP”). Subsequently, Inuvialuit Energy Security Project Ltd. (“IESPL”) provided,...
Technical Meeting for Potential Changes to Rule 012: Noise Control, AUC Bulletin 2023-02
Link to Bulletin Summarized Facilities - Rules The AUC has been consulting on amending certain provisions of Rule 012: Noise Control (“Rule 012”) to streamline and, improve regulatory and adjudicative processes. To date, the AUC conducted two rounds of written...
Subra GP Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Fox Coulee Solar Project, AUC Decision 28230-D01-2023
Link to Decision Summarized Electricity – Records Application Subra GP Ltd. (“Subra”) filed an application under the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public related to the 75-Megawatts...
Stirling Wind Project Ltd. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Stirling Wind Project I, AUC Decision 28228-D01-2023
Link to Decision Summarized Electricity – Records Application Stirling Wind Project Ltd. (“Stirling”) filed an application under the Fair, Efficient and Open Competition Regulation (“FEOCR”), seeking permission to share records not available to the public related to...
Alberta Electric System Operator Approval of Proposed Energy Storage Amendments to the ISO Rules, AUC Decision 28176-D01-2023
Link to Decision Summarized Electricity – ISO Amendment Application The Alberta Electric System Operator (“AESO”) requested approval of proposed amendments to a number of its rules and definitions in relation to energy storage. The AESO submitted that, while the use...
ATCO Gas and Pipelines Ltd. Franchise Agreement Renewal with the City of Cold Lake, AUC Decision 28210-D01-2023
Link to Decision Summarized Rates - Franchise Agreement Application ATCO Gas and Pipelines Ltd. (“ATCO Gas”) applied for approval of a natural gas franchise agreement (the “Agreement”), including a franchise fee of 13 percent, with the City of Cold Lake for 10 years...
Canadian Utilities Limited Corporate Reorganization Under Section 101 of the Public Utilities Act and Section 26 of the Gas Utilities Act, AUC Decision 28137-D01-2023
Link to Decision Summarized Rates - Stranded Assets Application Canadian Utilities Limited (“CUL”) applied for approval of an internal reorganization involving CUL subsidiaries under s 101(2)(d) of the Public Utilities Act (“PUA”) and s 26(2)(d) of the Gas Utilities...
EQUS REA Ltd. Amendments to the Code of Conduct Regulation Compliance Plan, AUC Decision 28002-D01-2023
Link to Decision Summarized Electricity - CCR Application EQUS REA Ltd. (“EQUS”) applied for approval of amendments to its Compliance Plan under s 32 of the Code of Conduct Regulation. The changes concerned: (1) a revision to EQUS’ Compliance Officer appointment; (2)...
Monitoring for Snowmelt and Overland Flooding, AER Bulletin 2023-18
Link to Bulletin Summarized Oil and Gas - Monitoring The AER cautioned against the hazards of seasonal snowmelt and resultant overland flooding. Specifically, licensees: (i) must physically inspect and assess any sites and equipment that have or may be affected by...