Regulatory Insights
RLC remains at the forefront of new developments in Canada’s energy sector to ensure we can act effectively on behalf of our clients and their interests.
These articles cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commission (AUC), and the Canada Energy Regulator (CER). Browse our searchable archives below.
ENMAX Power Corporation 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28575-D02-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application ENMAX Power Corporation (“ENMAX”) submitted its 2024 annual performance-based regulation (“PBR”) rate adjustment filing pursuant to the provisions of the third generation PBR (“PBR3”)...
ATCO Gas 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28569-D02-2024
Link to Decision Summarized Download Summary in PDF PBR-Rates - Gas Application ATCO Gas (“AG”) submitted its 2024 annual performance-based regulation (“PBR”) rate adjustment filing pursuant to the provisions of the third generation PBR (“PBR3”) plan. AG requested...
Airport City East Ltd. Airport City Solar Project, AUC Decision 27885-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities – Duty to Consult Application Airport City Solar East Ltd. (“ACSE”) requested approval to construct and operate the 112-megawatt (“MW”) Airport City Solar power plant (the “Project”) bordering the Edmonton...
Amendments to Rule 027, AUC Bulletin 2024-05
Link to Bulletin Summarized Download Summary in PDF Power - Law The AUC amended Rule 027: Specified Penalties for Contravention of Reliability Standards ("Rule 027") to include the reliability standard PER-006-AB-1 (R1), assigning this standard a penalty category 2....
EPCOR Distribution & Transmission Inc. 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28581-D02-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application EPCOR Distribution & Transmission Inc. (“EDTI”) submitted its 2024 annual performance-based regulation (“PBR”) rate adjustment filing pursuant to the provisions of the third...
Peace River Energy Project Inc. Peace River Energy Project and Interconnection, AUC Decision 28616-D01-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application Peace River Energy Project Inc. (“PREP”) applied for approval to construct and operate the 4.99-megawatt (“MW”) Peace River Energy Project solar power plant (the “Project”), located...
EPCOR Distribution & Transmission Inc. 2021 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 25866-D01-2020
Link to Decision SummarizedRates - Performance-Based Regulation In this decision, the AUC considered the 2021 annual performance-based regulation (“PBR”) rate adjustment filing from EPCOR...
BER Hand Hills Wind GP Inc. – Amendment to the Hand Hills Wind Project, AUC Decision 22843-D04-2020
Link to Decision SummarizedFacilities - Wind Power Project In this decision, the AUC approved an application from BER Hand Hills Wind GP Inc. (“BER Hand Hills”) for amendments to a previously...
Apex Utilities Inc. 2021 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 25867-D01-2020
Link to Decision SummarizedInterim Approval In this decision the AUC considered the 2021 annual performance-based regulation (“PBR”) rate adjustment filing from Apex Utilities Inc., formerly AltaGas...
Amendments to AUC Rules 002, 003, 021 and 028 to Reduce Regulatory Burden and Improve Efficiency, AUC Bulletin 2020-42
Link to Bulletin SummarizedAdministrative Efficiency - Updating Filing Requirements Following the introduction of the Red Tape Reduction Act by the government of Alberta the AUC made further rule...
Market Surveillance Administrator Proposes Amendments to AUC Rule 019, AUC Bulletin 2020-41
Link to Bulletin SummarizedApplication to ISO Rules - Penalty Escalation The AUC seeks stakeholder feedback on revisions to AUC Rule 019: Specific Penalties for Contravention of ISO Rules (“Rule...
EPCOR Distribution and Transmission Inc. – Decision on 2021 Customer Specific Distribution Access Service Rate Update for an Existing Customer, AUC Decision 26120-D01-2020
Link to Decision SummarizedRate Update Existing Customer In this decision, the AUC approved an application by EPCOR Distribution & Transmission Inc. (“EPCOR”) for a customer specific (“CS”)...
ENMAX Independent Energy Solutions Inc. – Connection for the Downtown District Energy Centre Combined Heat and Power Unit, AUC Decision 26110-D01-2020
Link to Decision SummarizedConnection Order In this decision, the AUC approved an application from ENMAX Independent Energy Solutions Inc. (“EIES”) for the connection of a 3.3-megawatt (“MW”)...
ATCO Electric Ltd – Decision on 2021 Interim Transmission Facility Tariff, AUC Decision 26083-D01-2020
Link to Decision SummarizedInterim Revenue Requirement In this decision, the AUC approved ATCO Electric Ltd.(“AEL”)’s annual interim facility owner tariff based on a continuation of its approved...
Alberta Electric System Operator – Decision on 2020 Rider A1 Extension Application, AUC Decision 25670-D01-2020
Link to Decision SummarizedCriteria for Extension of Duplication Avoidance Tariff In this decision, the AUC approved the extension of Rider A1 for the period January 1, 2022, to December 31,...
ATCO Pipelines 2021 Interim Revenue Requirement, AUC Decision 26031-D01-2020
Link to Decision SummarizedRates - Interim Rate Applications In this decision, the AUC considered an application filed by ATCO Pipelines (“AP”) requesting approval of its 2021 interim revenue...
AltaLink Management Ltd. 2016 to 2018 Deferral Accounts Reconciliation Application, AUC Decision 24681-D01-2020
Link to Decision SummarizedRates In this decision, the AUC made the following findings on the application from AltaLink Management Ltd. (“AML”) for the disposition of certain deferral accounts in...
Normtek Radiation Services Ltd. v Alberta Environmental Appeal Board, 2020 ABCA 456
Link to Decision SummarizedMeaning of “Directly Affected” - Environmental Protection and Enhancement Act SummaryThis was an appeal of a judicial review upholding a decision of the Alberta...
Declaration Naming an Individual Pursuant to Section 106(1) of the Oil and Gas Conservation Act, Regulatory Appeal No. 1931598
Link to Decision SummarizedRegulatory Appeal - Extension of Time - Section 106 OGCA This decision dealt with an individual’s request for a regulatory appeal filed on March 10, 2020 (“Request”) of an...
AltaLink Management Ltd. and TransAlta Corporation Direct Assigned Capital Deferral Account for the Edmonton Region Project, AUC Decision 25369-D01-2020
Link to Decision SummarizedPrudence of Costs - Indigenous Cooperation Agreements In this decision, the AUC determined that not all costs applied for in the deferral account reconciliation...
Name Change Order Apex Utilities Inc. from AltaGas Utilities Inc.
Link to Decision SummarizedName Change AltaGas Utilities Inc., a designated regulated gas utility pursuant to the Gas Utilities Designation Regulation amended its articles of incorporation to change...
Alberta Electric System Operator 2021 Balancing Pool Consumer Allocation Rider F Application, AUC Decision 26040-D01-2020
Link to Decision SummarizedDTS Market Participants - DOS Market Participant In this decision, the AUC approved the application from the Alberta Electric System Operator (“AESO”) for its 2021 Rider F...
Trans Mountain Expansion Project, Redwoods Golf Course Ltd. Detailed Route Hearing MH-021-2020, CER Letter Decision
Link to Decision SummarizedPipelines - Route Hearings BackgroundOn December 16, 2013, Trans Mountain Pipeline ULC (“Trans Mountain”) filed an application with the National Energy Board (“NEB”) under...
EPCOR Energy Alberta GP 2021 Regulated Rate Tariff Interim Rates Application, AUC Decision 26023-D01-2020
Link to Decision SummarizedRates In this decision, the AUC approved the application from EPCOR Energy Alberta GP Inc. (“EEA”) to apply existing non-energy charges for its regulated rate tariff...
Reducing Regulatory Burden: Checklist Applications for Certain Abbreviated Needs Identification Document Applications, AUC Bulletin 2020-40
Link to Bulletin Summarized The pilot project for low-risk electric transmission and gas utility pipeline applications launched in Bulletin 2020-15 will be expanded to include abbreviated needs...
Solar Krafte Utilities, Capital Power Generation Services Strathmore Solar Project, AUC Decision 25346-D01-2020
Link to Decision SummarizedFacilities - Solar Generation In this decision, the AUC approved an application from Solar Krafte Utilities Inc. (“Solar Krafte”) to construct and operate a power plant...
Proposed Amendments to AUC Rule 002 Will Reduce Regulatory Burden and Improve Efficiency, AUC Bulletin 2020-39
Link to Bulletin Summarized The AUC has proposed amendments to Rule 002: Service Quality and Reliability Performance Monitoring and Reporting for Owners of Electric Distribution Systems and for Gas...
Trans Mountain Pipeline ULC Trans Mountain Expansion Project Detailed Route Hearing MH-018-2020, CER Letter Decision
Link to Decision SummarizedPipelines - Route Hearing In this decision, the CER found that the detailed route proposed by Trans Mountain Pipeline ULC (“Trans Mountain”) for the Trans Mountain...
Cartwright v. Rocky View County Subdivision and Development Appeal Board, 2020 ABCA 408
Link to Decision SummarizedMunicipal Law - Real Property - Reasonable Apprehension of Bias In this decision, the ABCA allowed an application for the admission for fresh evidence and allowed the...
EPCOR Distribution & Transmission 2019 Annual Transmission Access Charge Deferral Account True-Up, AUC Decision 25803-D01-2020
Link to Decision SummarizedRates - Deferral Accounts In this decision, the AUC approved the application from EPCOR Distribution & Transmission Inc (“EPCOR”) for its 2019 annual transmission...