by rlcAdmin | Nov 28, 2023 | Water
Link to Decision Summarized Review and Variance – Changed Circumstance Application Corix Utilities (Foothills Water) Inc. (“Corix”) applied to the AUC for a review of the AUC’s Decision 27844-D02-2023 (the “Decision”). In the Decision, the AUC decided on the...
by rlcAdmin | Nov 27, 2023 | Electricity
Link to Decision Summarized Rates – ISO Tariff Application The Alberta Electric System Operator (“AESO”) applied for approval of its 2024 Balancing Pool consumer allocation Rider F of $1.30 per megawatt hour (“MWh”). Decision The AUC approved the applied-for...
by rlcAdmin | Nov 27, 2023 | Electricity
Link to Decision Summarized Electricity – Tariffs Application The Alberta Electric System Operator (“AESO”) applied for approval of a revised implementation plan for its adjusted metering practice (“AMP”) and related amendments to the Independent System Operator...
by rlcAdmin | Nov 24, 2023 | Electricity
Link to Decision Summarized Electricity – Communication Application ATCO Electric Ltd. (“AE”) applied for approval to construct and operate a 13-kilometer (km”) overhead fibre optic cable between AE’s existing Brintnell 876S Substation and Alberta PowerLine...
by rlcAdmin | Nov 15, 2023 | Oil/Gas
Link to Decision Summarized Oil and Gas – law On November 15, 2023, the AER released a new edition of the Pipeline Rules, which came in force on the same day. The amended Pipeline Rules: allow the use of temporary surface pipelines for water conveyance in...