by rlcAdmin | Aug 1, 2017 | Electricity
Download ReportPost-construction Sound Survey – AUC Rule 012 In this decision, the AUC considered whether Oldman 2 Wind Farm’s (“Oldman 2”) Spring 2017 Post-Construction Sound Survey at Receptors B, J, and K, complied with permissible sound levels set out in Rule 012:...
by rlcAdmin | Jul 27, 2017 | Electricity
Download ReportCost of Capital – Deemed Equity Ratio – Fair Return Standard On November 30, 2016, ENMAX Power Corporation (“ENMAX”) filed an application with the Alberta Utilities Commission requesting approval of a deemed equity ratio of 37 per cent for its...
by rlcAdmin | Jul 27, 2017 | Gas
Download ReportRegulatory Appeal Request – Appeal No. 1884107 – Dismissed In this decision, the AER considered Mike-Ro Farms Ltd.’s (“MRF”) request under section 38 of the Responsible Energy Development Act (“REDA”) for a regulatory appeal of the AER’s decision to...
by rlcAdmin | Jul 26, 2017 | Oil/Gas
Download ReportCrown Consultation – Reliance on Regulator to Meet Crown Consultation Obligation – Seismic Testing In this decision, a companion decision to Chippewas of the Thames First Nation v. Enbridge, Pipelines Inc., 2017 SCC 41 (“Thames”) (summarized above), the...
by rlcAdmin | Jul 26, 2017 | Oil/Gas
Download ReportCrown Consultation – Reliance on Regulator to Meet Crown Consultation Obligation – Pipelines Following the NEB’s approval of Enbridge Pipelines Inc. (“Enbridge”) Line 9 modification application in OH-002-2013 (the “NEB Decision”), the Chippewas of the...