Link to Decision SummarizedSolar Power - FacilitiesApplicationSolar Krafte Utilities Inc. (“Solar Krafte”) applied for approvals to construct and operate a 60-megawatt (“MW”) Vauxhall Solar Power Plant and associated Solstice 549S Substation (collectively, the...
Search Results
These articles by our expert team cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commision (AUC), and Canada Energy Regulator (CER). Browse our searchable archive below to learn more about the results we’ve achieved for our clients.
Rocktree Solar Inc. Rocktree Solar Project, AUC Decision 27445-D01-2022
Link to Decision SummarizedSolar Power - FacilitiesApplicationRocktree Solar Inc. (“Rocktree”), wholly owned and operated by Volatrix Group Inc., applied for permission to construct and operate the 18.4-megawatt (“MW”) Rocktree Solar Project (the “Project”). The...
NU-E Corp. Lethbridge 1 Solar Project Checklist Application, AUC Decision 27721-D01-2022
Link to Decision SummarizedSolar Power - FacilitiesApplicationNU-E Corp (“NU-E”) filed a checklist application with the AUC to construct and operate the 8.75-megawatt (“MW”) Lethbridge 1 Solar Project (the “Power Plant”) on 40 acres of private, cultivated land in the...
AltaLink Management Ltd. Dunmore Solar Project, AUC Decision 27046-D01-2021
Link to Decision SummarizedFacilities - SolarIn this decision, the AUC approved the applications from AltaLink Management Ltd. (“AML”) for permission to construct and operate the Dunmore Solar Project Connection.AUC Findings and DecisionAML applied to the AUC for...
SWITCH Power Corporation and 2079816 Alberta Ltd. Joffre Solar Project Phase 1 and 2, AUC Decision 26733-D01-2021
Link to Decision SummarizedSolar Power - FacilitiesIn this decision, the AUC approved an application from SWITCH Power Corporation (“SWITCH”) and its general partner, 2079816 Alberta Ltd., to construct and operate the 22-megawatt Joffre Solar Project Phase 1 and the...
SWITCH Power Corporation and 2079816 Alberta Ltd. Youngstown Solar Project, AUC Decision 26734-D01-2021
Link to Decision SummarizedSolar Power - FacilitiesIn this decision, the AUC approved an application from SWITCH Power Corporation (“SWITCH”) and its general partner, 2079816 Alberta Ltd., to construct and operate the 6.0-megawatt Youngstown Solar Power Plant (the...
Brooks Solar II GP Inc. Brooks Solar II Project Community Generation Designation, AUC Decision 26661-D04-2021
Link to Decision SummarizedCommunity Generating UnitsIn this decision, the AUC approved the application from Brooks Solar II GP Inc. (“Brooks Solar”) to qualify the Brooks Solar II Power Plant (the “Power Plant”), located in the County of Newell, as two community...
Horus Solar Alberta Kirckaldy Solar Energy Centre, AUC Decision 26395-D01-2021
Link to Decision SummarizedFacilities - Solar PowerIn this decision, the AUC approved the applications from Horus Solar Alberta Ltd. (“Horus”) to construct and operate the 350-megawatt (“MW”) Kirkcaldy solar power plant (the “Power Plant”) and the Kirkcaldy 1009S...
Solar Krafte Utilities, Capital Power Generation Services Strathmore Solar Project, AUC Decision 25346-D01-2020
Link to Decision SummarizedFacilities - Solar Generation In this decision, the AUC approved an application from Solar Krafte Utilities Inc. (“Solar Krafte”) to construct and operate a power plant designated as the Strathmore Solar Project, and to connect the proposed...
Barlow Solar Park Ltd. Corrigenda to Decision 25690-D01-2020, AUC Decision 25690-D01-2020 (Corrigenda)
Link to Decision SummarizedFacilities - Solar Generation In this decision, the AUC issued a corrigendum to Decision 25690-D01-2020. The AUC approved the application from Barlow Solar Park Ltd. to construct and operate a 27-megawatt solar power plant, designated as the...
Barlow Solar Park, AUC Decision 25690-D01-2020
Link to Decision SummarizedFacilities, Solar Power Plant In this decision, the AUC approved an application from Barlow Solar Park Ltd. (“Barlow Solar”) to construct and operate a 27-megawatt solar power plant in the City of Calgary, and to connect the power plant to...
Peavine Metis Settlement – 4.97-Megawatt Community Solar Power Plant, AUC Decision 25236-D01-2020
Link to Decision SummarizedFacilities - Solar Plant - Community Generation In this decision, the AUC considered applications from Peavine Metis Settlement (“Peavine MS”) to construct and operate a solar power plant designated as the 4.97-Megawatt Community Solar Power...
Drumheller Solar Corporation – Drumheller Solar and Battery Storage Project, AUC Decision 25234-D01-2020
Link to Decision SummarizedFacilities - Solar - Battery Storage In this decision the AUC considered applications from Drumheller Solar Corporation (“DSC”) to construct and operate a solar power plant and a battery energy storage system designated as the Drumheller...