Regulatory Insights
RLC remains at the forefront of new developments in Canada’s energy sector to ensure we can act effectively on behalf of our clients and their interests.
These articles cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commission (AUC), and the Canada Energy Regulator (CER). Browse our searchable archives below.
Enforcement Staff of the Alberta Utilities Commission Settlement Agreement with ATCO Electric Ltd., AUC Decision 29109-D01-2024
Link to Decision Summarized Download Summary in PDF Settlement Agreement – Public Trust Application The Alberta Utilities Commission (“AUC”) enforcement staff (“Enforcement Staff”) applied, under sections 8, 23 and 63 of the Alberta Utilities Commission Act (“AUC...
Treatment of Unbilled Deferral Recovery Amounts, AUC Decision 29271-D02-2024
Link to Decision Summarized Download Summary in PDF Regulated Rate Option - Billing Error Application In its September 2024 regulated rate option (“RRO”) filing with the Alberta Utilities Commission (“AUC”), ENMAX Energy Corporation (“EEC”) filed a letter seeking...
Dolcy Solar + Energy Storage Project, Decision 28723-D01-2024
Link to Decision Summarized Download Summary in PDF Solar – Facilities Application Dolcy Solar Inc. (“Dolcy”) applied to construct and operate the Dolcy Solar + Energy Storage Project (“Project”), which consisted of a 300-megawatt (“MW”) solar power plant, the Dolcy...
ATCO Gas and Pipelines Ltd. 2024 Unaccounted-For Gas Rider D and Rider P, AUC Decision 29250-D01-2024
Link to Decision Summarized Download Summary in PDF Gas – Rates Application ATCO Gas and Pipelines Ltd. (“AG”) requested approval of its 2024 Unaccounted-For Gas (“UFG”) Rider D and Rider P, effective November 1, 2024. AG calculated Rider D to increase from the...
Municipal District of Ranchland No. 66 v Alberta Energy Regulator, 2024 ABCA 274
Link to Decision Summarized Download Summary in PDF Permission to Appeal – Coal Exploration Application The applicant, the Municipal District of Ranchland No. 66 (“Ranchland”), sought permission to appeal a decision of the Alberta Energy Regulator (“AER”) that...
Harmony Advanced Water Systems Corporation EPCOR Alberta Utilities Holdings Inc. Share Transfer Application, AUC Decision 29083-D01-2024
Link to Decision Summarized Download Summary in PDF Share Transfer – No-Harm Test Application Harmony Advanced Water Systems Corporation (“HAWSCO”) filed an application with the Alberta Utilities Commission (“AUC”) requesting the AUC to authorize pursuant to s 102(1)...
AUC Updates to Rule 007, AUC Bulletin 2024-06
Link to Bulletin Summarized Download Summary in PDF Facilities – Applications The AUC updated Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System...
ATCO Pipelines, a division of ATCO Gas and Pipelines Ltd. 2024-2026 General Rate Application Negotiated Settlement Agreement and Excluded Matters, Decision 28369-D01-2024
Link to Decision Summarized Download Summary in PDF Gas – Rates Application ATCO Pipelines (“ATCO”) filed its general rate application (“GRA”) for 2024-2026, seeking AUC approval of the amount of...
Pivotal Energy Partners Inc. Application for an Order Permitting the Sharing of Records Not Available to the Public Regarding the Bantry Power Plant and Parkland Power Plant, AUC Decision 28894-D01-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application Pivotal Energy Partners Inc. (“Pivotal Energy”) applied under s 3 of the Fair, Efficient and Open Competition...
Kinbrook Solar, GP Inc. and Solar Krafte Utilities Inc. Rainier Solar Farm, AUC Decision 28439-D01-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application Kinbrook Solar, GP Inc. and Solar Krafte Utilities Inc. (the “Applicants”) applied to construct and operate a...
ENMAX Power Corporation 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28575-D02-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application ENMAX Power Corporation (“ENMAX”) submitted its 2024 annual performance-based regulation (“PBR”) rate adjustment...
ATCO Gas 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28569-D02-2024
Link to Decision Summarized Download Summary in PDF PBR-Rates - Gas Application ATCO Gas (“AG”) submitted its 2024 annual performance-based regulation (“PBR”) rate adjustment filing pursuant to the...
Airport City East Ltd. Airport City Solar Project, AUC Decision 27885-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities – Duty to Consult Application Airport City Solar East Ltd. (“ACSE”) requested approval to construct and operate the 112-megawatt (“MW”)...
Amendments to Rule 027, AUC Bulletin 2024-05
Link to Bulletin Summarized Download Summary in PDF Power - Law The AUC amended Rule 027: Specified Penalties for Contravention of Reliability Standards ("Rule 027") to include the reliability...
EPCOR Distribution & Transmission Inc. 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28581-D02-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application EPCOR Distribution & Transmission Inc. (“EDTI”) submitted its 2024 annual performance-based regulation (“PBR”)...
Peace River Energy Project Inc. Peace River Energy Project and Interconnection, AUC Decision 28616-D01-2024
Link to Decision Summarized Download Summary in PDF Rates - Electricity Application Peace River Energy Project Inc. (“PREP”) applied for approval to construct and operate the 4.99-megawatt (“MW”)...
Aura Power Renewables Ltd. Peace Butte Solar Farm and Battery Storage Project, AUC Decision 28259-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities - Solar Application Aura Power Renewable Ltd. (“Aura Power”) applied for approval to construct and operate the 230-megawatt (“MW”)...
ATCO Electric Ltd. 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28570-D02-2024
Link to Decision Summarized Download Summary in PDF Facilities - Solar Application ATCO Electric Ltd. (“AE”) submitted its 2024 annual performance-based regulation (“PBR”) rate adjustment filing...
Yatar v. TD Insurance Meloche Monnex, 2024 SCC 8
Link to Decision Summarized Download Summary in PDF Administrative Law – Judicial Review v. Statutory Appeal Application Ummugulsum Yatar (“Ms. Yatar”) contested the denial of her insurance...
Apex Utilities Inc. 2024 Annual Performance-Based Regulation Rate Adjustment, AUC Decision 28583-D02-2024
Link to Decision Summarized Download Summary in PDF Rates – Special Charges Application Apex Utilities Inc. (“AUI”) applied for approval of the 2024 annual performance-based regulation (“PBR”) rate...
Green Block Mining Corp. Decision on Application for Review and Variance of Decision 26379-D05-2023 and Decision 28792-D01-2024 – Settlement Agreement with Green Block Mining Corp., Formerly Link Global Technologies Inc., AUC Decision 28869-D01-2024
Link to Decision Summarized Download Summary in PDF Administrative Penalty – Extension Application Green Block Mining Corp. (“Green Block”) sought a second extension of the deadline for payment of...
EPCOR Energy Alberta GP Inc. Updated 2024 Interim Regulated Rate Tariff Non-Energy Rates, AUC Decision 28457-D01-2024
Link to Decision Summarized Download Summary in PDF Rates – Rate Increase Application EPCOR Energy Alberta GP Inc. (“EPCOR”) applied for approval of its updated 2024 interim regulated rate tariff...
FortisAlberta Inc. Application for Direction to Pay Compensation Related to Site Transfers, AUC Decision 28358-D01-2024
Link to Decision Summarized Download Summary in PDF Facilities - Value Application FortisAlberta Inc. (“Fortis”) requested the AUC to direct the transfer of electric distribution system assets from...
Enmax Corporation v Independent System Operator (Alberta Electric System Operator), 2024 ABCA 83
Link to Decision Summarized Download Summary in PDF Electricity - Appeal Application This was an appeal of a chambers judge decision (“Decision”) dismissing the originating application of ENMAX...
AUC Inquiry Into the Ongoing Economic, Orderly and Efficient Development of Electricity Generation in Alberta – Module A Report, AUC Decision 28501-D01-2024
Link to Decision Summarized Download Summary in PDF Electricity – Markets Application On August 3, 2023, the Government of Alberta (“GoA”) issued an order-in-council (“Order”) directing the AUC to...
Salt Box Coulee Water Supply Company Ltd. Decision on Preliminary Question Application for Review of Decision 28021-D02-2024 and Order 28021-D03-2024, AUC Decision 28021-D04-2024
Link to Decision Summarized Download Summary in PDF Water – Review and Variance Application Salt Box Coulee Water Supply Company Ltd. (“Salt Box”) applied to the AUC for a review of Decision...
New and Enhanced Functionality Moving to OneStop, AER Bulletin 2024-06
Link to Bulletin Summarized Download Summary in PDF Applications - Process The AER announced new functionality and enhancements to its OneStop platform. The AER will post notice and schedule a...
Inuvialuit Energy Security Project Ltd – Application for Authorization for Installation and Operation of the Energy Centre, File OF-EP-OA-I184-1414 03/4257714, C28698-1
Link to Decision Summarized Download Summary in PDF Gas - Facilities Application Inuvialuit Energy Security Project Ltd. (“IESPL”) applied to the Canadian Energy Regulator (“CER”) for approval of...
Site Reduction Reclamation Certificate Pilot, AER Bulletin 2024-05
Link to Bulletin Summarized Download Summary in PDF Facilities – Partial Reclamation In December 2023, Alberta Environment and Protected Areas (“AEPA”) announced the Interim directive: pilot for...
Pilot for Reclaiming Peatlands, AER Bulletin 2024-04
Link to Bulletin Summarized Download Summary in PDF Oil and Gas – Land Reclamation On December 14, 2023, Alberta Environment and Protected Areas (“AEPA”) released the Interim directive: pilot for...