by rlcAdmin | Jun 1, 2016 | Oil
Download ReportRegulatory Appeal – Reclamation – Facilities On May 2, 2014, Canadian Natural Resources Limited (“CNRL”) applied for a reclamation certificate for a well site and access road in 11-9-083-13W6M (the “11-9 Site”). On October 20, 2014, the AER refused to...
by rlcAdmin | May 25, 2016 | Uncategorized
Download ReportSafety – Pipelines The NEB announced it had struck a Joint Committee on Issues of Mutual Interest for Federally Regulated Pipelines (the “Joint Committee”) with the Canadian Energy Pipeline Association (“CEPA”). Senior leadership from both the NEB and...
by rlcAdmin | May 19, 2016 | Gas
Download ReportCapital Tracker – Rates – True-Up AltaGas Utilities Inc. (“AltaGas”) filed its compliance filing with the AUC pursuant to directions issued in Decision 20522-D02-2016.Direction 1 and 3The AUC directed AltaGas to calculate and include the revenue...
by rlcAdmin | May 19, 2016 | Electricity
Download ReportFacilities – Wind Farm E.ON Climate & Renewables Ltd. (“EON”) applied to the AUC for the construction and operation of the Grizzly Bear Creek Wind Power Project (the “Project”). The Project consists of: Fifty 2.4-megawatt (MW) wind turbines, with a...
by rlcAdmin | May 19, 2016 | Electricity
Download ReportFacilities – Wind Farm E.ON Climate & Renewables Ltd. (“EON”) applied to the AUC for the construction and operation of the Grizzly Bear Creek Wind Power Project (the “Project”). The Project consists of: Fifty 2.4-megawatt (MW) wind turbines, with a...