by rlcAdmin | Jun 1, 2016 | Gas
Download ReportPool Delineation – Application Bearspaw Petroleum Ltd. (“Bearspaw”) applied to the AER pursuant to section 33(1)(d) of the Oil and Gas Conservation Act (“OGCA”) requesting that the AER include Bearspaw’s well located at 102/11-24-24-28W4M (“102/11-24”)...
by rlcAdmin | Jun 1, 2016 | Oil
Download ReportRegulatory Appeal – Reclamation – Facilities On May 2, 2014, Canadian Natural Resources Limited (“CNRL”) applied for a reclamation certificate for a well site and access road in 11-9-083-13W6M (the “11-9 Site”). On October 20, 2014, the AER refused to...
by rlcAdmin | May 25, 2016 | Uncategorized
Download ReportSafety – Pipelines The NEB announced it had struck a Joint Committee on Issues of Mutual Interest for Federally Regulated Pipelines (the “Joint Committee”) with the Canadian Energy Pipeline Association (“CEPA”). Senior leadership from both the NEB and...
by rlcAdmin | May 19, 2016 | Gas
Download ReportCapital Tracker – Rates – True-Up AltaGas Utilities Inc. (“AltaGas”) filed its compliance filing with the AUC pursuant to directions issued in Decision 20522-D02-2016.Direction 1 and 3The AUC directed AltaGas to calculate and include the revenue...
by rlcAdmin | May 19, 2016 | Electricity
Download ReportFacilities – Wind Farm E.ON Climate & Renewables Ltd. (“EON”) applied to the AUC for the construction and operation of the Grizzly Bear Creek Wind Power Project (the “Project”). The Project consists of: Fifty 2.4-megawatt (MW) wind turbines, with a...