by rlcAdmin | Jan 23, 2017 | Gas
Download ReportRegulatory Appeal – Natural Gas Facilities – Pipeline Application BackgroundOn June 8, 2015, Bonavista Energy Corporation (“BEC”) submitted to the AER nonroutine applications for two horizontal gas wells to be drilled from the surface location of two...
by rlcAdmin | Jan 19, 2017 | Electricity
Download ReportElectricity Transmission Line – International Power Line In this NEB decision, the NEB found that the Lake Erie Connector international power line project (the “Project”) to be in the public interest and to be required by the present and future public...
by rlcAdmin | Jan 18, 2017 | Oil/Gas
Download ReportApplication for Extension of Time to Appeal – Application Denied – AER Does not Owe Private Duty of Care In Goodhart v Alberta Energy Regulator, the ABCA considered Mr. Goodhart’s application seeking an extension of time to file his appeal of an ABQB...
by rlcAdmin | Jan 17, 2017 | Oil/Gas
Download ReportFacilities Application – Pipelines The Proposed ProjectOn 4 December 2015, Enbridge Pipelines Inc. (“Enbridge”) filed an application (the “Application”) with the NEB seeking approval to replace an existing section of the Line 10 Pipeline (the...
by rlcAdmin | Jan 13, 2017 | Oil/Gas
Download ReportAlberta Energy Regulator – Statutory Immunity for Administrative Decision Making Bodies – Availability of Charter Remedies Against Regulatory Bodies In Ernst v Alberta Energy Regulator, the SCC considered an appeal of the Alberta Court of Appeal...