Regulatory Law Chambers logo

Electricity Representative Work

Berkshire Hathaway Energy – Canada

Re: BHEC-RES Alberta G.P. Inc. facility application to construct and operate the 398.475-megawatt Forty Mile Wind Power Project and the Forty Mile 516S Substation.

Regulator: Alberta Utilities Commission.

Year: 2018.

Capstone Infrastructure Corporation

Re: Vauxhall Section 15(2) Transmission Regulation Exception Application.

Regulator: Alberta Utilities Commission.

Year: 2023.

Capstone Infrastructure Corporation

Re: Wild Rose 2 Project Transmission Congestion Issues.

Year: 2022.

Castleview Ridge Estates Resident’s Group

Re: Enel Riverview Wind Power Project.

Regulator: Alberta Utilities Commission.

Year: 2019.

Encana Corporation 

Re: Requests for review and variance of the Alberta Utilities Commission Decision 2012-104 Complaint by Milner Power Inc. regarding ISO Transmission Loss Factor Rule and Loss Factor Methodology. 

Regulator: Alberta Utilities Commission. 

Year: 2014.

Encana Corporation 

Re: Capital Power Generation Services Inc.’s application for an amendment to the power plant approval for Genesee 3 to be relieved from the requirement to offset greenhouse gas emissions to be equal to greenhouse gases from a corresponding natural gas combined cycle generation facility.

Regulator: Alberta Utilities Commission.

Year: 2011.

ENMAX Corporation

Re: Complaint about the AESO’s conduct regarding non-payment for Unforeseeable Transmission Must Run Service by Calgary Energy Centre and Crossfield Energy Centre in 2013. 

Regulator: Alberta Utilities Commission. 

Year: 2017.

ENMAX Energy Corporation

Re: 2023-2024 Regulated Rate Option Energy Price Setting Plan One-Year Extension Application.

Regulator: Alberta Utilities Commission.

Year: 2024.

ENMAX Energy Corporation

Re: AUC Inquiry into the ongoing economic, orderly and efficient development of electricity generation in Alberta.

Regulator: Alberta Utilities Commission.

Year: 2023.

ENMAX Energy Corporation

Re: AUC Settlement Agreement re ENMAX Billing System Self Report.

Regulator: Alberta Utilities Commission.

Year: 2023.

ENMAX Energy Corporation

Re: 2022-2025 Non-Energy Application.

Regulator: Alberta Utilities Commission.

Year: 2022.

ENMAX Energy Corporation

Re: Regulated Rate Option (RRO) Application.

Regulator: Alberta Utilities Commission.

Year: 2022.

ENMAX Energy Corporation

Re: 2023+ Energy Price Setting Plan (EPSP) Application.

Regulator: Alberta Utilities Commission.

Year: 2022.

ENMAX Energy Corporation

Re: Alberta Electric System Operator Bulk Tariff Design.

Regulator: Alberta Utilities Commission.

Year: 2021.

ENMAX Energy Corporation

Re: Commission initiated proceeding to consider ISO rules to implement and operate the capacity market.  

Regulator: Alberta Utilities Commission. 

Year: 2019.

Heritage Wind Farm Development

Re: Facility application to construct and operate a double circuit 240 kV transmission line from Pincher Creek to North Lethbridge.

Regulator: Alberta Utilities Commission.

Year: 2009.

Independent Power Producers Society of Alberta  

Re: Relevant legislative framework applicable to allowing an alternate customer connection provider for interconnection facilities and development of an asset transfer agreement. 

Year: 2013.

Industrial Gas Users Association

Re: Considerations related to Trans Québec and Maritimes Pipeline Inc. Matters.

Year: 2021.

Kalina Distributed Power Ltd.

Re: Alberta Electric System Operator Compliance Filing Decision 25848-D01-2020 regarding Alberta Electric System Operator Stage 2 Review and Variance of Decision 22942-D02-2019 Adjusted Metering Practice and Substation Fraction Methodology.

Regulator: Alberta Utilities Commission.

Year: 2021.

Kalina Distributed Power Ltd.

Re: FortisAlberta Inc. Distribution-Connected Generation Credit Module for Fortis’s 2022 Phase II Distribution Tariff Application.

Regulator: Alberta Utilities Commission.

Year: 2020.

Kalina Distributed Power Ltd. 

Re: Review and variance application from Community Generation Working Group and FortisAlberta Inc. of Decision 22942-D02-2019 regarding Alberta Electric System Operator 2018 Independent System Operator Tariff.

Regulator: Alberta Utilities Commission.

Year: 2020.

Kalina Distributed Power Ltd.

Re: Distribution System Inquiry. 

Regulator: Alberta Utilities Commission. 

Year: 2020.  

Kalina Distributed Power Ltd.

Re: Alberta Electric System Operator Adjusted Metering Practice and Substation Fraction Methodology.

Regulator: Alberta Utilities Commission.

Year: 2020.

Kalina Distributed Power Ltd. / Lionstooth Energy Inc. / Signalta Resources Limited / Campus Energy Partners LP

Re: Appeal of AUC Decision 26090-D01-2021 regarding distribution-connected generation credits.

Court: Court of Appeal of Alberta.

Year: 2022.

Kalina Distributed Power Ltd. / Lionstooth Energy Inc. / Signalta Resources Limited / Campus Energy Partners LP

Re: Review and variance application of AUC Decision 26090-D01-2021 regarding distribution-connected generation credits.

Regulator: Alberta Utilities Commission.

Year: 2021.

Kalina Distributed Power Ltd. / Lionstooth Energy Inc. / Signalta Resources Limited / Campus Energy Partners LP

Re: Application for Permission to Appeal of AUC Decision 26090-D01-2021 regarding distribution-connected generation credits.

Court: Court of Appeal of Alberta.

Year: 2021.

Kalina Distributed Power Ltd. / Lionstooth Energy Inc. / Signalta Resources Limited / Campus Energy Partners LP

Re: Judicial Review Application of AUC Decision 26090-D01-2021 regarding distribution-connected generation credits.

Court: Court of King’s Bench of Alberta.

Year: 2021.

Kalina Distributed Power Ltd. / Signalta Resources Limited / Campus Energy Partners LP

Re: Alberta Electric System Operator 2023 Adjustment Metering Practice Implementation.

Court: Alberta Utilities Commission.

Year: 2023.

Kalina Distributed Power Ltd. / Signalta Resources Limited / Campus Energy Partners LP

Re: Alberta Electric System Operator 2022 Tariff Modernization Application.

Court: Alberta Utilities Commission.

Year: 2022.

Kalina Distributed Power Ltd. / Signalta Resources Limited / Campus Energy Partners LP

Re: Application for Permission to Appeal AUC Decision on Standing.

Court: Court of Appeal of Alberta.

Year: 2022.

Kalina Distributed Power Ltd. / Signalta Resources Limited / Campus Energy Partners LP

Re: Alberta Electric System Operator Adjustment Metering Practice Implementation.

Regulator: Alberta Utilities Commission.

Year: 2022.

NaturEner Energy Canada Inc.

Re: British Columbia Hydro and Power Authority relief application in relation to MATL permit EP-301, an international transmission line. 

Regulator: National Energy Board.

Year: 2012.

NaturEner Energy Canada Inc.

Re: Facility application to construct and operate the 162 MW Wild Rose 2 Wind Energy Project and the associated Eagle Butte Substation.

Regulator: Alberta Utilities Commission.

Year: 2011.

NaturEner Energy Canada Inc.

Re: Facility application to construct and operate the 204 MW Wild Rose 1 wind power plant and associated substation.

Regulator: Alberta Utilities Commission.

Year: 2010.

NaturEner Energy Canada Inc. 

Re: Market Participant Rule Objection for the proposed Transmission Constraint Management Rule. 

Regulator: Alberta Utilities Commission. 

Year: 2009.

NaturEner Energy Canada Inc. 

Re: Need approval of the South Transmission Reinforcement System.

Regulator: Alberta Utilities Commission.

Year: 2009.

NaturEner Energy Canada Inc. 

Re: Customer choice to construct related to the East Palliser radial transmission line connecting to the Alberta Interconnected Electric System. 

Regulator: Alberta Utilities Commission.

Year: 2009.

NaturEner Energy Canada Inc. and NaturEner USA, LLC  

Re: Leave to appeal application with respect to the Montana Alberta Tie Ltd. international transmission line (related to the National Energy Board and Alberta Utilities Commission regulatory approval process).

Regulator: Supreme Court of Canada.

Year: 2009.

NaturEner USA, LLC 

Re: Appeal applications with respect to the Alberta Utilities Commission Decision 2013-025 regarding ISO Rules Section 203.6 – Available Transfer Capability and Transfer Path Management. 

Court: Court of Appeal of Alberta.

Year: 2015.

NaturEner USA, LLC 

Re: Market Participant Rule Objection – ISO Rules Section 203.6 – Available Transfer Capability and Transfer Path Management. 

Regulator: Alberta Utilities Commission. 

Year: 2013.

NaturEner Wild Rose 1 Energy Inc.

Re: Amendment to the previously approved Wild Rose 1 Wind Power Plant.

Regulator: Alberta Utilities Commission.

Year: 2013.

NaturEner Wild Rose 2 Energy Inc. 

Re: Amendment to the previously approved Wild Rose 2 Wind Power Plant.

Regulator: Alberta Utilities Commission.

Year: 2014.

Pipeline Company

Re: Electricity Expert Services in Industry Arbitration 

Year: 2022.

PSC Group (Comprised of Suncor Energy Inc., Imperial Oil Resources Limited, Shell Canada Energy, Canadian Natural Resources Limited, The City of Medicine Hat, Cenovus Energy Inc., and Syncrude Canada Ltd.)

Re: ISO Tariff 2015 Deferral Account Reconciliation methodology – calculation of the Primary Service Credit.

Regulator: Alberta Utilities Commission.

Year: 2017.