Journey Energy Inc. Gilby Thermal Power Plant, AUC Decision 27860-D01-2023

Link to Decision Summarized

Thermal Power – Facilities

Application

Journey Energy Inc. applied for approval to construct and operate the 15.5-megawatt Gilby Thermal Power Plant (the “Power Plant”) and connect the Power Plant to FortisAlberta Inc.’s 25-kilovolt electric distribution system. The Power Plant will be located within the boundary of the Gilby Sweet Gas Processing Plant, operated by Journey Energy Inc. 10 kilometers southwest of Rimbey. The area of the Gilby Sweet Gas Processing Plant would expand by approximately 0.56 hectares.

Decision

The AUC approved the application for permission to construct and operate the Power Plant.

Applicable Legislation

Alberta Utilities Commission Act, SA 2007, c A-37.2.

Hydro and Electric Energy Act, RSA 2000, c H-16.

Historical Resources Act, RSA 2000, c H-9.

AUC Rule 001: Rules of Practice

AUC Rule 012: Noise Control

Alberta Ambient Air Quality Objectives and Guidelines