by rlcAdmin | Aug 10, 2022 | Markets
Link to Decision SummarizedFEOC Regulation – MarketsApplicationEnfinite Corporation (“Enfinite”) filed an application seeking permission to share records not available to the public related to the 22-megawatt (“MW”) eReserve3 Battery Energy Storage Power Plant...
by rlcAdmin | Aug 8, 2022 | Oil/Gas
Link to Decision SummarizedGas – RatesApplicationIn Decision 2014-268, the AUC approved ATCO Gas, a division of ATCO Gas and Pipelines Ltd.’s load balancing methodology for a single province-wide load balancing deferral account (“LBDA”). Load balancing is part...
by rlcAdmin | Aug 5, 2022 | Oil/Gas
Link to Decision SummarizedGas – FacilitiesApplicationATCO Gas and Pipelines Ltd. (“AGP”) applied for permission to install approximately 9.4 km of new 219.1-millimeter natural gas pipeline in Lethbridge County, to replace a section of the existing Lethbridge...
by rlcAdmin | Aug 3, 2022 | Electricity
Link to Decision SummarizedGas – FacilitiesApplicationKiwetinohk Energy Corp. (“KEC”) applied for approval to construct and operate the 101.133-megawatt (“MW”) flexible gas-fired Opal Power Plant and associated Gemini 1008S Substation (the “Project”). The...
by rlcAdmin | Aug 2, 2022 | Electricity
Link to Decision SummarizedElectricity – FacilitiesApplicationEnfinite Corporation (“Enfinite”) applied for approval to construct and operate the 20-megawatt (“MW”) eReserve9 Battery Energy Storage Power Plant Project (the “Power Plant”).DecisionThe AUC approved...