by rlcAdmin | Sep 1, 2022 | Uncategorized
Link to Decision SummarizedSolar Power Plant ApprovalApplicationSR Scotford Inc (“SR Scotford”) filed an application with the AUC for approval to construct and operate a 58-megawatt solar power plant, designated as the Scotford Solar Power Project (the “Power Plant”)....
by rlcAdmin | Sep 1, 2022 | Electricity
Link to Decision SummarizedApproval TransferApplicationBTG Power Corp. (“BTG”) and Horseshoe Power GP Ltd. (“Horseshoe”) filed applications with the AUC to transfer the approvals related to two power plants located near Nevis and Lacombe from Horseshoe to BTG....
by rlcAdmin | Sep 1, 2022 | Electricity
Link to Decision SummarizedElectricity – Gas – RatesApplicationsThis decision deals with the 2023 cost-of-service (“COS”) applications from two natural gas distribution facility owners (“DFOs”), ATCO Gas and Pipelines Ltd. (“ATCO Gas”) and Apex Utilities Inc....
by rlcAdmin | Aug 30, 2022 | Electricity
Link to Decision SummarizedFibre Optic Telecommunications CableApplicationEPCOR Distribution & Transmission Inc. (“EDTI”) applied for approval to construct and operate an approximately 4.4-kilometer fibre optic cable, designated as FO-132, between the Rossdale and...
by rlcAdmin | Aug 30, 2022 | Electricity
Link to Decision SummarizedFlood Mitigation – Electricity Substation Construction Work – The City of Calgary Land Use Bylaws New Buildings in FloodwayApplicationENMAX Power Corporation (“EPC”) identified an arc-flash hazard from existing outdoor switchgear at its No....