by rlcAdmin | Nov 16, 2022 | Solar
Link to Decision SummarizedSolar Power – FacilitiesApplicationJurassic Solar GP Ltd. (“Jurassic”) applied to the AUC for approval to construct and operate a 220-megawatt (“MW”) solar power plant, a battery energy storage system (“BESS”) with a storage capacity...
by rlcAdmin | Nov 16, 2022 | Electricity
Link to Decision SummarizedElectricity – MarketsApplicationDirect Energy Regulated Services (“DERS”) filed an application requesting that the AUC enforce Rule 004: Alberta Tariff Billing Code Rules (“Rule 004”) on ATCO Electric Ltd. (distribution) and ATCO Gas...
by rlcAdmin | Nov 10, 2022 | Electricity
Link to Decision SummarizedRates – ElectricityApplicationThe Alberta Electric System Operator (“AESO”) applied for approval of a new bulk and regional rate design (the “Proposed Rate Design”).In the AESO’s view, the current rate design does not recognize that an...
by rlcAdmin | Nov 9, 2022 | Solar
Link to Decision SummarizedFacilities – ElectricityApplicationsTransCanada Energy Ltd. (“TransCanada”) has approval to construct and operate the 102.5-megawatt Saddlebrook Solar and Battery Storage Project (the “Power Plant”) located near Aldersyde. TransCanada...
by rlcAdmin | Nov 7, 2022 | Electricity
Link to Decision SummarizedFacilities – NoiseApplicationThe City of Grande Prairie (“Grand Prairie”) applied to the AUC for permission to operate the existing 666-kilowatt Eastlink Centre Power Plant (the “Power Plant”) located at the Eastlink Centre...