Alberta Electric System Operator Needs Identification Document Application, EPCOR Distribution & Transmission Inc. Facility Applications Clover Bar Interconnection Project, AUC Decision 27676-D01-2023

Link to Decision Summarized Electricity – Facility Application The AUC previously granted approval to Air Products to construct and operate an electric system, designated as an industrial system, at its hydrogen plant, which included a 90.5-megawatt (“MW”)...