by rlcAdmin | Nov 24, 2023 | Electricity
Link to Decision Summarized Electricity – Communication Application ATCO Electric Ltd. (“AE”) applied for approval to construct and operate a 13-kilometer (km”) overhead fibre optic cable between AE’s existing Brintnell 876S Substation and Alberta PowerLine...
by rlcAdmin | Nov 15, 2023 | Oil/Gas
Link to Decision Summarized Oil and Gas – law On November 15, 2023, the AER released a new edition of the Pipeline Rules, which came in force on the same day. The amended Pipeline Rules: allow the use of temporary surface pipelines for water conveyance in...
by rlcAdmin | Nov 14, 2023 | Appeal, Electricity
Link to Decision Summarized Appeal – Procedural Fairness Appeal This was an appeal by AltaLink Management Ltd. (“AML”), ATCO Electric Ltd. (“AE”), ENMAX Power Corp. (“ENMAX”) and EPCOR Distribution and Transmission Inc. (“EDTI”) from the AUC’s decision to...
by rlcAdmin | Nov 10, 2023 | Electricity
Link to Decision Summarized Wind Power – Safety Application RES Forty Mile Wind GP Corp (“RES”) applied to amend, construct and operate the previously approved Forty Mile Wind Power Project (the “Project”) and the Forty Mile 516S Substation. RES also applied to...
by rlcAdmin | Nov 9, 2023 | Electricity
Link to Decision Summarized Electricity – Service Area Application ATCO Electric Ltd. (“AE”) applied to the Alberta Utilities Commission (“AUC”) for: confirmation of exclusive service area boundaries as determined by applicable Electric Distribution System...