by rlcAdmin | Aug 27, 2020 | Electricity
Link to Decision SummarizedAlteration of E.L Smith Solar Power Plant – Increasing Operational Performance In this decision, the AUC approved the application from EPCOR Water Services Inc. (”EPCOR Water”) for the alteration of a power plant designated as the E.L...
by rlcAdmin | Aug 27, 2020 | Electricity
Link to Decision SummarizedInterim Refundable Approval – Settlement of Net Deferral Account Shortfall In this decision, the AUC approved, on an interim and refundable basis, the Alberta Electric System Operator’s (“AESO”) request to settle its 2019 net deferral...
by rlcAdmin | Aug 21, 2020 | Oil/Gas
Link to Decision SummarizedSurplus Determination – New Export Licence In this decision, the CER decided, pursuant to Section 344 of the Canadian Energy Regulator Act (“CER Act”), to issue a 25-year Licence to AltaGas Limited Partnership (“AltaGas”), subject to...
by rlcAdmin | Aug 21, 2020 | Electricity
Link to Decision SummarizedStand-Alone Battery Energy Storage Facility – Power Plant In this decision, the AUC approved the application from TERIC Power Ltd. (“TERIC”) to construct and operate the eReserve2 Battery Energy Storage Power Plant Project, and to...
by rlcAdmin | Aug 20, 2020 | Electricity
Link to Decision SummarizedConditional Power Plant Approval – Industrial System Designation – Interconnection Application In this decision, the AUC approved the application from Osum Production Corp. (“Osum”) to construct and operate a power plant...