by rlcAdmin | Oct 19, 2020 | Electricity
Link to Decision SummarizedAUC Jurisdiction – Historical Resources In this decision, the AUC approved applications from AltaLink Management Ltd. (“AltaLink”) to decommission and salvage portions of transmission lines 80L and 716L.ApplicationsAltaLink filed...
by rlcAdmin | Oct 14, 2020 | Solar
Link to Decision SummarizedFacilities, Solar Power Plant In this decision, the AUC approved an application from Barlow Solar Park Ltd. (“Barlow Solar”) to construct and operate a 27-megawatt solar power plant in the City of Calgary, and to connect the power plant to...
by rlcAdmin | Oct 13, 2020 | Uncategorized
Link to Decision SummarizedRates In this decision, the AUC set the return on equity (“ROE”) of 8.5 per cent and deemed equity ratio of 37 per cent (39 per cent for AltaGas Utilities Inc.) (collectively, the ROE and equity ratios, referred hereto as “Parameters”) for...
by rlcAdmin | Sep 29, 2020 | Electricity
Link to Decision SummarizedRates In this application, the AUC approved the application by the City of Lethbridge (“Lethbridge”) for the 2021 interim and refundable transmission facility owner (“TFO”) tariff. The AUC approved Lethbridge’s 2021 interim and refundable...
by rlcAdmin | Sep 29, 2020 | Electricity
Link to Decision SummarizedRates In this decision, the AUC approved the application by the City of Red Deer (“Red Deer”) for its 2021 interim transmission facility owner (“TFO”) tariff. The AUC approved the interim refundable TFO tariff of $439,583 per...