by rlcAdmin | Nov 19, 2020 | Electricity
Link to Decision SummarizedReview and Variance – Salvage In this decision, the AUC varied findings from Decision 23848-D01-2020 (the “Decision”) and approved the net salvage method proposed by AltaLink Management Ltd. (“AltaLink”).IntroductionAltaLink proposed...
by rlcAdmin | Nov 19, 2020 | Uncategorized
Link to Bulletin Summarized The AUC has proposed amendments to Rule 021: Settlement System Code Rules and Rule 028: Natural Gas System Settlement Code that would:Remove the Pre-final error correction process requirement from both rules;Remove the USA transaction...
by rlcAdmin | Nov 19, 2020 | Uncategorized
Link to Bulletin Summarized On November 19, 2020, Rule 027: Specified Penalties for Contravention of Reliability Standards came into effect in its amended form. Rule 027 was amended to reflect a revision to the naming of an Alberta reliability standard PRC-005-AB1-6...
by rlcAdmin | Nov 19, 2020 | Water
Link to Decision SummarizedRetroactive Ratemaking – Exception In this decision, the AUC approved the existing water services rates of Sage Water Services Corp. (“Sage Water”), as interim rates, effective November 19, 2020.Introduction and BackgroundOn June 28,...
by rlcAdmin | Nov 18, 2020 | Electricity
Link to Decision SummarizedNeeds Identification Document – Facility Application In this decision, the AUC considered four applications by three parties:Application 25074-A001 by the Alberta Electric System Operator (“AESO”) for approval of the needs...