On November 19, 2020, Rule 027: Specified Penalties for Contravention of Reliability Standards came into effect in its amended form. Rule 027 was amended to reflect a revision to the naming of an Alberta reliability standard PRC-005-AB1-6 to PRC-005-AB2-6, that came into effect on October 13, 2020.
Alberta Electric System Operator Application for Revised Adjusted Metering Practice Implementation Plan and Related Amendments to Independent System Operator Tariff and Rules, AUC Decision 28441-D02-2024
Link to Decision Summarized Download Summary in PDF Electricity – Rules Application The Alberta Electric System Operator (“AESO”) applied for approval of a revised adjusted metering practice (“AMP”)...