Regulatory Law Chambers logo

BTG Power Corp. Approval Transfers for Power Plants Near Nevis and Lacombe, AUC Decision 27573-D01-2022

Link to Decision Summarized

Approval Transfer

Application

BTG Power Corp. (“BTG”) and Horseshoe Power GP Ltd. (“Horseshoe”) filed applications with the AUC to transfer the approvals related to two power plants located near Nevis and Lacombe from Horseshoe to BTG. Transfer of the connection orders for the respective power plants is also sought. The proposed approval transfer relates to facilities previously approved by the AUC under Approval 22987-D02-2017 and Order 22987-D03-2017 regarding a 3.6-megawatt (“MW”) natural gas-fired power plant located near Nevis and connected to FortisAlberta Inc.’s distribution system and Approval 22987-D04-2017 and Order 22987-D05-2017 2017 regarding a 3.9-MW natural gas-fired power plant located near Lacombe and connected to FortisAlberta Inc.’s distribution system.

Decision

The AUC approved the requested power plant approval transfers outlined in the applications.

Applicable Legislation

Hydro and Electric Energy Act, RSA 2000, c H-16 – ss. 23.

Related Posts

Auer v. Auer, 2024 SCC 36

Auer v. Auer, 2024 SCC 36

Link to Decision Summarized Download Summary in PDF Appeal – Standard of Review What standard of review applies when we determine whether a regulation is established within the scope of the enabling...