FEOC Regulation – Markets
Application
The Balancing Pool (“BP”) filed an application for the preferential sharing of records that are not available to the public relating to the 13.9-megawatt Chappice Lake Solar Project between the Balancing Pool, Chappice Lake GP Inc. (“Chappice Lake GP”), Chappice Lake Limited Partnership (“Chappice Lake LP”), Elemental Energy Inc. (“EEI”), Elemental Energy Renewables Inc. (“EERI”) and URICA Energy Real Time Ltd (“URICA”).
Decision
The AUC granted the application to permit the sharing of records pertaining to the Alberta energy market.
Applicable Legislation
Alberta Utilities Commission Act, SA 2007, c A-37.2 – s 39(2)(a)(vi).
Electric Utilities Act, SA 2003, c E-5.1 – s 6.
Fair, Efficient and Open Competition Regulation, Alta Reg 159/2009 – ss 2, 3, and 5(5).