Regulatory Law Chambers logo

DND Consultants eStruxture Data Centers, CAL-2 Data Center Facility, Four (4) Backup Diesel Generators, Thermal Power Plant Application, AUC Decision 27614-D01-2022

Link to Decision Summarized

Power Plant – Diesel Generators

Application

eStruxture Data Centers (“eStruxture”) filed an application with the AUC for approval to construct and operate a 12-megawatt diesel power plant, designated as the CAL-2 power plant (“the Power Plant”). eStruxture requested approval to construct the Power Plant at 149 High Plains Place in Rocky View County.

Decision

The AUC granted eStruxture approval to construct and operate the Power Plant.

Applicable Legislation

Alberta Utilities Commission Act, SA 2007, c A-37.2 – ss. 9, 13 and 17.

Environmental Protection and Enhancement Act, RSA 2000, c E-12.

Hydro and Electric Energy Act, RSA 2000, c H-16 – ss. 11 and 23.

AUC Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations, Hydro Developments and Gas Utility Pipelines

AUC Rule 012: Noise Control

Related Posts