Bulletin 2015-03: Observed Seismicity and Oil and Gas Operations: Operators’ Responsibilities

Download Report

Bulletin – Seismicity – Licensee Responsibilities


On February 3, 2015, the AER released Bulletin 2015-03 confirming a seismic event that took place on January 22, 2015 in the vicinity of Fox Creek, Alberta. The seismic event, measuring 4.4 on the Richter scale, was part of a sequence of lower level seismic events near Crooked Lake. The bulletin notes that there were no impacts to the public or the environment.

The bulletin reminds licensees of their responsibility to ensure well control and subsurface integrity in accordance with AER Directive 083: Hydraulic Fracturing – Subsurface Integrity, for all stages of drilling, completions, and injection operations.

Related Posts

Sabo v AltaLink Management Ltd, 2024 ABCA 179

Sabo v AltaLink Management Ltd, 2024 ABCA 179

Link to Decision Summarized Download Summary in PDF Authority – Compensation Award Application On appeal from AltaLink Management Ltd. (“AML”), the Alberta Court of Appeal (“ABCA”) considered...