Draft amendments to AUC Rule 007 to streamline application requirements for needs identification documents and abbreviated needs identification documents (Bulletin 2015-12)

Download Report

Bulletin – Rule 007


The AUC announced the release of draft amendments to Rule 007: Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments (“Rule 007”) to streamline application requirements with respect to needs identification documents as enabled by recent amendments enacted by the Transmission Amendment Regulation, AR 175/2014, and the Transmission Deficiency Regulation, AR 176/2014. These amendments provided for a number of changes, including clarification and amendment of the requirements with respect to needs identification documents still requiring AUC approval.

The AUC has requested feedback from stakeholders in respect of the draft of Rule 007 on or before August 14, 2015.

Related Posts

Sabo v AltaLink Management Ltd, 2024 ABCA 179

Sabo v AltaLink Management Ltd, 2024 ABCA 179

Link to Decision Summarized Download Summary in PDF Authority – Compensation Award Application On appeal from AltaLink Management Ltd. (“AML”), the Alberta Court of Appeal (“ABCA”) considered...