Link to Decision SummarizedReliability Standard In this decision, the AUC approved the new Alberta reliability standard ADM-002-AB-1 proposed by the Alberta Electric System Operator (“AESO”) pursuant to subsection 19(4)(b) of the Transmission Regulation.BackgroundThe...
Search Results
These articles by our expert team cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commision (AUC), and Canada Energy Regulator (CER). Browse our searchable archive below to learn more about the results we’ve achieved for our clients.
Alberta Electric System Operator Rejection of Reliability Standard MOD-026-1 (AUC Decision 23917-D01-2018)
The AUC accepted and relied on the AESO’s assertion that no market participant was likely to be affected by the rejection of the NERC MOD Standard and that no formal consultation was required.
Alberta Electric System Operator Application regarding Critical Infrastructure Protection Alberta Reliability Standards (Decision 3441-D01-2015)
The AUC approved the Critical Infrastructure Protection Alberta reliability standards related to cyber security to become effective on the dates proposed by the AESO.