Link to Decision Summarized Solar Power - Facilities Application Foothills Solar GP Inc. (“Foothills Solar”), a wholly owned subsidiary of Elemental Energy Renewable Inc., applied for permission to construct and operate the 150-megawatt (“MW”) Foothills Solar Power...
Search Results
These articles by our expert team cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commision (AUC), and Canada Energy Regulator (CER). Browse our searchable archive below to learn more about the results we’ve achieved for our clients.
Versorium Energy Ltd. Benalto 1 Distributed Energy Resource Power Plant, AUC Decision 26919-D01-2021
Link to Decision SummarizedFacilities - Natural GasIn this decision, the AUC approved the applications from Versorium Energy Ltd. (“Versorium”) to construct and operate the 5.044 megawatt (“MW”) natural gas-fired power plant (the “Power Plant”) near Sylvan Lake. The...
Versorium Energy Ltd. Briker 1 Distributed Energy Resource Power Plant and Interconnection, AUC Decision 26841-D01-2021
Link to Decision SummarizedFacilities - Natural GasIn this decision, the AUC approved the applications from Versorium Energy Ltd. (“Versorium”) to construct and operate the 5.0 megawatt (“MW”) natural gas-fired power plant (the “Power Plant”) near Paradise Valley. The...
Horseshoe Power GP Ltd. Gull Lake Cogeneration Power Plant Expansion Project, AUC Decision 25044-D01-2020
Link to Decision SummarizedConditional Approval - Application for Connection Closed - Application for Industrial System Designation Closed In this decision, the AUC approved the application from Horseshoe Power GP Ltd. (“Horseshoe Power”) to construct and operate a...