Link to Decision SummarizedBattery Energy Storage - FacilitiesApplicationConcord Monarch GP2 Ltd. (“Concord Monarch”) filed an application with the AUC for approval to alter the already approved Monarch Solar Project (the “Power Plant”) by adding a 21-megawatt,...
Search Results
These articles by our expert team cover the details of various decisions made by the Alberta Energy Regulator (AER), Alberta Utilities Commision (AUC), and Canada Energy Regulator (CER). Browse our searchable archive below to learn more about the results we’ve achieved for our clients.
Concord Coaldale GP2 Ltd. Coaldale Solar Project Battery Energy Storage System Addition, AUC Decision 27216-D01-2022
Link to Decision SummarizedBattery Energy Storage - FacilitiesApplicationConcord Coaldale GP2 Ltd. (“Concord”) filed an application with the AUC for approval to alter the already approved Coaldale Solar Project (the “Power Plant”) by adding a 21-megawatt,...
TA Alberta Hydro Inc. WaterCharger Battery Storage Facility, AUC Decision 27109-D01-2022
Link to Decision SummarizedElectricity - Battery Storage FacilityApplicationTA Alberta Hydro Inc. (“TA Hydro”) applied for permission to construct and operate the 180-megawatt (“MW”) WaterCharger Battery Storage Facility (the “Project”). The Project will be located 15...
Drumheller Solar Corporation – Drumheller Solar and Battery Storage Project, AUC Decision 25234-D01-2020
Link to Decision SummarizedFacilities - Solar - Battery Storage In this decision the AUC considered applications from Drumheller Solar Corporation (“DSC”) to construct and operate a solar power plant and a battery energy storage system designated as the Drumheller...